FCC Cheat Sheet 2026

The 30 highest-yield FCC facts, distilled from real exam questions. Print it, save it as a PDF, or study it here — free, no sign-up.

100 questions
240 min time limit
70% to pass
  1. What is the maximum height of a handrail above the stair nosing, as specified in the Florida Building Code – Residential? 38 inches
  2. When new equipment is introduced in a Florida Certified Contractors setting, what is REQUIRED before staff members use it? Formal training, competency verification, and documentation of training completion
  3. When placing concrete in hot weather conditions (above 90°F), which of the following is the most effective method to reduce mix temperature? Using chilled water or ice to replace part of the mix water
  4. How should Florida Certified Contractors professionals handle equipment that shows signs of malfunction during operation? Immediately cease operation, secure the equipment, and report the malfunction
  5. What is the purpose of a construction estimate? To project total job costs for budgeting
  6. Which scheduling method explicitly identifies ALL activities that, if delayed, will delay the project completion date? Critical Path Method (CPM)
  7. What is a contingency in estimating? Coverage for unexpected costs or risks
  8. Which financial requirement must a Florida Certified Building Contractor meet to qualify for licensure? Demonstrate a minimum net worth or credit score as set by the CILB
  9. Under the Florida Building Code, what is the minimum slope required for a low-slope membrane roof to ensure proper drainage? 1/4 inch per foot
  10. What is the maximum angle of repose (from horizontal) for a spoil pile placed adjacent to a trench excavation? At least 2 feet from the edge of the excavation
  11. Which approach is MOST important for FCC professionals when applying technical procedures? Adhering to established protocols while adapting to specific conditions
  12. Earned Value Management (EVM) uses which formula to calculate Schedule Variance (SV)? SV = Earned Value − Planned Value
  13. Which NFPA standard governs the installation of portable fire extinguishers on construction sites in Florida? NFPA 10
  14. When a FCC professional encounters an unexpected result during a technical procedure, the FIRST action should be to: Stop, assess the situation, and determine whether to proceed or seek guidance
  15. What is the minimum lap splice length for a #5 deformed rebar in a tension zone when f'c = 3,000 psi, per ACI 318? 30 inches
  16. What is the PROPER procedure for decommissioning outdated equipment in Florida Certified Contractors practice? Follow established protocols for safe decommissioning, data clearing, and proper disposal
  17. Under the Florida Building Code, which load type must be considered when designing a roof structure specifically because of Florida's climate? Wind load
  18. Which type of foundation is most commonly used in Florida residential construction due to the state's soil conditions and high water table? Monolithic slab-on-grade
  19. The Florida Energy Efficiency Code for Building Construction is adopted as part of which volume of the Florida Building Code? Florida Building Code – Energy Conservation
  20. Under the AIA A201 General Conditions, the Architect's authority to reject nonconforming work is BEST described as: Authority to require removal or correction, but not to terminate the contract
  21. A project owner issues a unilateral change order reducing the contract scope. Under standard contract terms, the contractor's BEST immediate response is to: Perform the reduced scope and reserve rights in writing
  22. According to ASTM C94, ready-mixed concrete must be discharged within how many minutes or revolutions of the drum after the introduction of water? 90 minutes or 300 revolutions
  23. Which of the following actions requires a building permit in Florida? Adding a new electrical circuit
  24. What does 'Gross Profit Margin' measure in a construction company's financial performance? Revenue minus direct project costs, expressed as a percentage of revenue
  25. A trench that is 5 feet deep in Type C soil must be protected by which method? Sloping, shoring, or shielding
  26. Florida law requires contractors to maintain business records for a minimum of how many years? 3 years
  27. Which preventive maintenance approach is MOST effective for FCC professionals managing equipment? Schedule regular maintenance based on manufacturer recommendations and usage patterns
  28. Under Florida law, what is the penalty for contracting without a license (unlicensed contracting) on the first offense? A civil citation with a fine up to $5,000 per offense
  29. Florida Statute 255.0525 governs advertisement of public construction bids. What is the minimum advertisement period for projects over $500,000? 21 days
  30. What is the minimum concrete cover required for reinforcing steel in a concrete slab exposed to earth or weather per ACI 318? 1.5 inches