EVT EVT Charging Systems & Infrastructure 1 — Questions and Answers
Question 1: What SAE standard defines the Combined Charging System (CCS) connector used for DC fast charging in North America?
- SAE J1772 (Correct answer)
- SAE J2954
- SAE J1171
- SAE J1113
Correct answer: SAE J1772
SAE J1772 defines both the AC Level 1/Level 2 and the CCS DC fast-charge connector standard widely used in North America.
Question 2: A Level 2 EVSE operates at 240V AC and delivers up to 80A continuous. What is the maximum continuous output power in kilowatts?
- 12.8 kW
- 19.2 kW (Correct answer)
- 7.2 kW
- 11.5 kW
Correct answer: 19.2 kW
Power equals voltage × current, so 240V × 80A = 19,200 W = 19.2 kW.
Question 3: Which communication protocol does the CCS DC fast charger use to negotiate charging parameters with the vehicle?
- CAN bus
- ISO 15118 / DIN 70121 (Correct answer)
- MODBUS RTU
- J1850 VPW
Correct answer: ISO 15118 / DIN 70121
ISO 15118 (and its predecessor DIN 70121) defines the power line communication protocol used between CCS chargers and EVs to negotiate voltage, current, and authentication.
Question 4: What is the purpose of the Control Pilot (CP) signal in an SAE J1772 charging circuit?
- It measures the state of charge of the battery
- It carries the AC power to the vehicle inlet
- It communicates vehicle connection state and maximum available current to the EVSE (Correct answer)
- It monitors ground fault current
Correct answer: It communicates vehicle connection state and maximum available current to the EVSE
The Control Pilot is a PWM signal whose duty cycle tells the vehicle the EVSE's maximum available current, and whose voltage level indicates the connection state.
Question 5: A technician measures 0V on the Control Pilot line while the EV is plugged into a Level 2 EVSE. What does this most likely indicate?
- Normal state – vehicle is fully charged
- EVSE is in a fault or not energized state (Correct answer)
- Vehicle is actively drawing maximum charge current
- Ground fault detected in the cable
Correct answer: EVSE is in a fault or not energized state
A 0V CP signal indicates the EVSE is de-energized or in a fault condition; normal standby is +12V DC.
Question 6: Which NEC article primarily governs the installation of electric vehicle supply equipment (EVSE) in the United States?
- NEC Article 480
- NEC Article 625 (Correct answer)
- NEC Article 702
- NEC Article 445
Correct answer: NEC Article 625
NEC Article 625 covers Electric Vehicle Power Transfer Systems, including EVSE installation requirements for wiring, grounding, and protection.
What SAE standard defines the Combined Charging System (CCS) connector used for DC fast charging in North America?