CPSM Cheat Sheet 2026

The 30 highest-yield CPSM facts, distilled from real exam questions. Print it, save it as a PDF, or study it here — free, no sign-up.

50 questions
60 min time limit
70.00% to pass
  1. What role does peer review play in the CPSM design process? It provides independent verification, catches errors, and enhances overall quality
  2. What role does continuous feedback play in CPSM quality improvement processes? It provides ongoing data for identifying trends, successes, and areas needing improvement
  3. What is a key benefit of project integration management? It ensures seamless coordination among project processes
  4. Why is monitoring risk important throughout the project? To address new risks and minimize their impact
  5. Which type of requirement specifies constraints on how the system performs its functions, such as response time? Non-functional requirements
  6. What does a RAG (Red/Amber/Green) status indicator in project reporting communicate? Visual health indicators showing severity of project status on key dimensions
  7. What is the relationship between time, cost, and quality in project management? Increasing cost improves quality and timeline
  8. How does scope creep affect a project? It leads to increased costs, delays, and poor quality
  9. During project execution, a technical lead makes a 'minor' design change without submitting a change request. The PM should: Require a formal change request and reverse the change if denied
  10. What does the concept of 'resource calendar' define in project resource management? When specific resources are available, including working days, holidays, and shifts
  11. Which scheduling method determines the longest path through the project network to identify the minimum project duration? Critical Path Method (CPM)
  12. Which integration management activity ensures that changes to one knowledge area are reflected across all related plans? Perform Integrated Change Control
  13. Which stakeholder analysis technique maps stakeholders by their level of interest and level of power? Power/Interest grid
  14. Which document formally authorizes a project manager to apply organizational resources and establishes their authority? Project charter
  15. The 100% rule in WBS development means: The WBS must capture 100% of the work defined in the project scope
  16. Which metric best measures sustainable team productivity in an agile software project over multiple iterations? Team velocity (story points completed per sprint)
  17. Which team development stage in Tuckman's model is characterized by conflicts over roles and responsibilities? Storming
  18. Which technique uses a structured group session to gather requirements from multiple stakeholders simultaneously? Joint Application Development (JAD)
  19. What scheduling technique splits a task and allows another higher-priority task to use the resource temporarily? Preemptive scheduling
  20. After implementing a corrective action, what is the project manager's most important next step? Monitor performance to verify the corrective action was effective
  21. What is the purpose of stakeholder management in project management? To prioritize stakeholders based on their influence and importance
  22. What is a software baseline in configuration management? A formally reviewed and agreed-upon specification used as a basis for further development
  23. Which EVM metric represents the monetary value of work actually completed at a given point in time? Earned Value (EV)
  24. How does the CPSM body of knowledge relate to daily professional practice? It provides the foundational framework that guides decision-making and standard practices
  25. A schedule compression technique that overlaps phases or tasks that would normally be done sequentially is called: Fast tracking
  26. What is a use case primarily used for in requirements engineering? Describing interactions between users and the system to achieve a goal
  27. What is the purpose of a communication plan in project management? To outline how and when information will be communicated
  28. In Certified Software Project Manager practice, what is the CORRECT sequence when performing a technical procedure? Plan, prepare, execute, verify, and document
  29. How does the CPSM body of knowledge relate to daily professional practice? It provides the foundational framework that guides decision-making and standard practices
  30. Which contract type provides the buyer with the most flexibility to change scope during execution? Time and Materials (T&M)