CISSP Business Continuity 5 β Questions and Answers
Question 1: Which technique provides the HIGHEST data availability by writing data simultaneously to two separate storage systems?
- Asynchronous replication
- RAID 5 striping with parity
- Synchronous mirroring (Correct answer)
- Tape vaulting
Correct answer: Synchronous mirroring
Synchronous mirroring writes data to both primary and secondary storage in real time, ensuring zero data loss if one system fails.
Question 2: A BCP team discovers that a critical vendor has no continuity plan. What is the BEST immediate action?
- Terminate the vendor contract immediately
- Assess the risk and develop a contingency plan for vendor failure (Correct answer)
- Accept the risk since vendor operations are outside the organization's control
- Report the finding to regulators
Correct answer: Assess the risk and develop a contingency plan for vendor failure
The organization should assess the criticality of the vendor and develop an internal contingency plan or require the vendor to establish BCPs contractually.
Question 3: What is the purpose of a continuity of operations plan (COOP)?
- To restore IT systems after a cyberattack
- To ensure essential government or organizational functions continue during a disruption (Correct answer)
- To document insurance claims following a disaster
- To test vendor SLAs during simulated outages
Correct answer: To ensure essential government or organizational functions continue during a disruption
A COOP is designed to ensure that essential functions of an organization (especially government agencies) continue during and after a disaster.
Question 4: During a full interruption test, what significant risk does the organization accept?
- Personnel may not be familiar with recovery procedures
- Primary systems are taken offline, risking real business disruption if recovery fails (Correct answer)
- Costs may exceed the disaster recovery budget
- Regulatory auditors may review the test results
Correct answer: Primary systems are taken offline, risking real business disruption if recovery fails
A full interruption test shuts down actual production systems, meaning a failed recovery directly impacts real business operations.
Question 5: Which factor is MOST important when selecting a geographic location for an alternate processing site?
- Proximity to the primary site for easy personnel commute
- Location outside the same natural disaster risk zone as the primary site (Correct answer)
- Lower operating costs compared to the primary location
- Availability of high-speed fiber internet connectivity
Correct answer: Location outside the same natural disaster risk zone as the primary site
The alternate site must be far enough from the primary site that a regional disaster such as a hurricane or earthquake cannot affect both simultaneously.
Question 6: A company defines its crisis communication plan. Which group should be addressed FIRST in an external communication sequence?
- Media and press outlets
- General public via social media
- Regulators and key stakeholders as required by law or contract (Correct answer)
- Customers via marketing email
Correct answer: Regulators and key stakeholders as required by law or contract
Legal and contractual obligations typically require notifying regulators and key stakeholders before broader public communications.
Question 7: Which BCP concept ensures that no single employee's absence can halt a critical business process?
- Separation of duties
- Cross-training and succession planning (Correct answer)
- Least privilege
- Job rotation
Correct answer: Cross-training and succession planning
Cross-training ensures multiple employees can perform critical functions, and succession planning designates backups for key roles, eliminating single points of human failure.
Which technique provides the HIGHEST data availability by writing data simultaneously to two separate storage systems?