CDA Study Guide 2026

Everything you need to pass the CDA exam in one place: the exam format, every topic to study, real practice questions with explanations, flashcards, and full-length practice tests. Free, no sign-up needed.

📋 CDA Exam Format at a Glance

50
Questions
60 min
Time Limit
70%
Passing Score

📚 CDA Topics to Study (69)

✍️ Sample CDA Questions & Answers

1. How should CDA professionals measure success in agile testing & quality practices?
Using defined metrics, benchmarks, and regular evaluation against established goals

Success in agile testing & quality practices is measured through defined metrics and benchmarks, with regular evaluation against established professional goals.

2. A DA team uses pair programming as a debt prevention strategy. What is the primary mechanism by which pairing reduces debt?
Real-time code review catches issues and encourages cleaner design decisions

Two developers reviewing code simultaneously catch problems early and naturally discuss better design alternatives, reducing introduced debt.

3. In DAD, what is the recommended approach when a team discovers mid-sprint that a committed user story is too large to complete?
Split the story and carry the remainder to the next sprint

DAD recommends splitting oversized stories and carrying the unfinished portion to the next sprint rather than canceling or abandoning work.

4. What foundational concept underpins technical debt & refactoring strategies in the CDA framework?
A systematic approach grounded in industry standards and professional expertise

Technical Debt & Refactoring Strategies in CDA practice is built on systematic, standards-based approaches combined with professional expertise.

5. A value stream that has long cycle times but high throughput most likely suffers from:
Large batch sizes and high work-in-progress

Large batches keep total cycle time high while pushing many items through, creating the paradox of high throughput paired with long individual lead times (Little's Law).

6. A team tracks their cumulative flow diagram (CFD) and notices the 'In Progress' band is widening over time. What does this indicate?
Work is accumulating in progress and not flowing through to completion

A widening 'In Progress' band on a CFD signals that work is piling up in-flight and not being completed at the same rate it is being started.

🎯 Free CDA Practice Tests

📖 CDA Guides & Articles

Your CDA Study Path
1. Learn with Flashcards → 2. Drill Practice Tests → 3. Take the Full Exam Simulation
Was this helpful?